NEWS- The National Water and Sewerage Corporation (NWSC) will strengthen the supply of drinking water to the people of Masaka town in central Uganda. The public company has just acquired a new water pumping station with a capacity of 160,000 m3 per hour.
National Water and Sewerage Corporation (NWSC) is increasing its efficiency in Masaka, a town in central Uganda, located west of Lake Victoria. The company, which provides the drinking water utility in the East African country, has just acquired a new pumping station.
The prefabricated installation has a capacity of 160,000 m3 of water per hour. According to Emmanuel Mujuni, Regional Manager of NWSC – Masaka, the new station started operation on 1st January 2023 pumping water from Lake Victoria.
The raw water will be transported to the Nabajjuzi drinking water plant which has been rehabilitated. The resource will be stored in the four Masaka town reservoirs located at Bwala Hill, Boma, Kitovu and Kyabakuza.
Once commissioned, the new NWSC pumping station will support the two existing facilities that supply 5.52 million m3Â of water daily, or 230,000 m3Â of water per hour. The three stations will produce a total of 9.36 million m3Â of water per day, equivalent to 390,000 m3Â every hour.
Uganda is committed to providing safe and affordable drinking water for all by 2030, and the NWSC’s approach supports this vision. According to Water.org, 7 million Ugandans still do not have access to safe drinking water, out of an estimated population of 49 million.
NWSC is also focusing on drinking water supply (WATSAN) to meet the population’s demand. In November 2022, the company inaugurated a PEA in Rukungiri, in the Western Region of Uganda.
The new drinking water supply system consists of an intake with a capacity of 400 m3Â per hour located on the Kahengye River. The raw water is transported through two pipelines of 4.3 km and 22.5 km to a new drinking water plant in Kahengye.
The plant has a capacity of 200 m3Â per hour, or 4,800 m3Â of water per day.
By NWSC staff
